Landfill Constructionrwm "The Landfill Site" web site: Landfill and Waste Management UK

nuright02WASTE AND RESOURCE MANAGEMENT NEWSLETTER

Enter your Email


Powered by FeedBlitz

Last Updated:
 

Add to My Yahoo! 

 

Buy web hosting from 1&1- Get More for Less Money 

A UK landfill site during restoration capping

A UK landfill site during restoration capping

When this photograph was taken the landfill operator was capping the site with a plastic membrane, above which was placed clay subsoil and topsoil-like material. It will soon be seeded and grassed and will then form a natural looking feature in the landscape.
The cap will seal the top of the site, and that will minimise the volume of leachate generated. However, some will continue to collect at the base and will still need to be removed. So the wells in the foreground have been installed to remove the remaining leachate and gas generated. All the pipes seen in this picture will soon be buried, and grassed over.

 

[Home] [Waste Directory] [Waste News] [Hazardous Waste] [Inert Waste] [Articles] [Landfill Pictures] [Events] [Site Map] [Members] [Landfill Terms] [Skip Hire Info] [SWMPS Solid Waste Management Plans] [Contact Us] [Legal] [Site Map]