One Stop Shop Introduced in UK for Environmental Permits by Defra UK

Environmental permits (EPs) are the new buzz-word in environmental regulation. The UK environmental regulations have been simplified for the first time in years with the advent of Environmental Permitting, in a recent move which has gone largely unreported in the technical press.

In a move welcomed by industry, the Environmental Permitting (England and Wales) Regulations (EP) were brought into effect on the 6 April 2008. At their heart these regulations continue to implement existing statutes but are aimed at delivering a risk-based approach that should streamline and simplify regulation reducing the bureaucratic requirements for the less high risk sites.

Whereas both waste activities and industrial activities, were previously regulated under separate Waste Management Licensing (WML), and Integrated Pollution Prevention and Control (IPPC) regulations, both will from now on be regulated together under a single new regime.

This is quite a difficult process as the two sets of regulations differ in detail, although both seek to protect the environment by minimising and controlling emissions. If this new way of handling these regulations is successful, it is thought that Defra will extend the same methods to other environmental regulations which will be brought under the EP umbrella, over a period of time.

 

The greatest benefits enjoyed by process operators, especially in the waste sector, where multiple authorisations have until now been an unwelcome feature of the WML and IPPC regimes.

At the core of the EP simplification philosophy will be the publication of a series of standard permits for each type of site. However, these have not all been written yet and were only at the time of writing available for waste management facilities. These types of installations are those where waste is processed such as in Waste Transfer Stations, Household and Civic Amenity Waste sites, and Materials Recycling Facilities (MRFs).

The full range of regulatory requirements still applies to large and high risk installations, but there is now an option of applying for a standard permit, which is now available for low to medium risk facilities . This is subject to capacity limits on standard permits which will restrict their use to most sites to treating 75,000 tonnes of waste per year (but this could be as low as 5,000 tonnes per year for outdoor waste transfer stations).

The option to apply for a bespoke permit for all sites will remain open to applicants who wish to maximise operational flexibility, although this will also revert a project to the much criticised old system which was often slated for its high application costs, and potential for delays in agreement which would delay project programmes.

For those familiar with the Waste Management Licensing Regime, the EP regime will bring requirements similar to those seen in PPC permits, including tightened staff competency requirements and formalised Environmental Management Systems (EMS).

Operators of existing sites need not be concerned that their consents/permits will need to be re-negotiated. We understand that existing PPC permits or waste management licence holders will not have to re-apply for an Environmental Permit or EP.

Multiple Sites Under Environmental Permitting (EP)?

For operations eligible for standard permits, the EP regulations will bring a potential opportunity for the site operator to save money and streamline permit administration. This comes about due to the fact that the new regulations (Reg. 17(d)) allow an operator to hold one standard permit that can apply to more than one site in different locations.

Operating a number of sites under a single permit could be a lot cheaper when making the application and in future subsistence fees, although the details of this are still to be clarified.

The Future for Environmental Permitting (EP)?

There is now a second phase of the EP Programme (EPP2) planned by Defra during it plans to extend the common permitting approach to a number of other environmental permitting regimes. Whoever, this will take time to implement and is likely to take two or more years to implement, from Summer 2008.

Activities which may in future be suitable for EPs include water discharge consenting, groundwater abstraction authorisation, river water abstraction, radioactive substances regulation and licensing of some waste carriers and brokers.

Can we Help You?

If you are making an application for a new waste or industrial process, modifying an existing consent or simply require more information.

“The Landfill Site.Com” will be able recommend to you experts who can help you do this.

We can put you in touch with consultants who have a track record of more than 400 PPC applications and waste management license applications successfully completed, and they are working on the first new EP applications.

Just send us an email to the address given on our Contact Page, or use the form provided.

 

 

 

Waste is A
Hot Subject Right Now! Understand
the Waste Technologies with this great eBook:

An Introduction to Waste Technologies

 WASTE-TECHNOLOGIES-paperback3D_160wd

 If you find this web site interesting, or you were trying to find out about Waste Technologies, from Incineration to MBT, MRFs, and Composting, then you are bound to find our ebook even more so!

 This ebook includes concise information on each technology plus very broad estimated costs for each type of facility.

 Buy now at our lower price of £12.99 (GBP) about $20 US.)

Buy it online here, and
you can be downloading it in the next 5 minutes - available at any time. 30 day money back guarantee.

 

[Home] [Articles] [Environmental Permits EPs]

 

[Home] [Waste Directory] [Waste News] [Hazardous Waste] [Inert Waste] [Articles] [Landfill Pictures] [Events] [Downloads] [Site Map] [Landfill Terms] [Skip Hire Info] [SWMPS Solid Waste Management Plans] [Contact Us] [Legal]

© 2000 - 2012 IPPTS Associates -
The Landfill Site